news
13.07.2023
Work on new primary school at Fermignano (PU) is nearing completion. The interior fittings are being completed while externally the building is finished.
The new school is built on one floor, covering an area of approximately 3200 square metres, and consists of 20 classrooms, 3 classrooms for laboratory activities (technology, science, art, etc.), a library, a 200 square metre assembly hall for recreational activities (music, theatre, dance, etc.) and a gymnasium with independent access.
The building, made entirely of laminated wood, was designed taking into account the standards imposed by the earthquake regulations and those in force for school buildings, at the same time pursuing both the improvement of its accessibility (with particular reference to access on foot) and its environmental sustainability through the use of materials and plant engineering systems aimed at obtaining adequate comfort with high energy performance.
Client: Municipality of Fermignano
DESIGNER: Mr Gianluca GOSTOLI (architect)
DESIGN GROUP:
Structures and systems: Mr Massimo BRUCIATI MIETTI (engineer)
Graphics: Ms Elisa CAMPOLUCCI (architect)
Technical and Administrative Proceedings: Mr Massimiliano PICCINI (surveyor)
Works Manager: Mr Gianluca GOSTOLI (architect)
Safety coordinator during the performance phase: Mr Mauro URBINELLI (surveyor)
Tester: Mr Francesco PASSETTI (engineer)
Site Technical Manager: Mr Pietro PACI (engineer)
Proceedings Manager: Mr Luca STORONI (architect)
CONSTRUCTION COMPANIES
ITER srl
Piazzale Primo Maggio, 9
61121 - Pesaro (PU)
COSTRUZIONI MELIFFI E GUIDI srl
Via Michelangelo, 83
61049 - Urbania (PU)
SUBISSATI srl
Via Fratelli Lombardi, 2-6
60010 - Ostra Vetere (AN)