The speed with which the construction phases are following one another is concrete proof of the advantages of timber construction over traditional techniques, particularly of the Platform Frame building system and the Subissati working method, where design, production and installation are all managed in-house, without interruptions or unexpected setbacks.
Next steps in the turnkey formula
In just four weeks from the start of the construction site, all the exterior works for closing the building envelope have been completed: load-bearing structure, external insulation (cappotto), roofing, windows and doors, and scaffolding removal.
The project now continues with all the interior works included in the “turnkey” formula, designed to deliver the client a complete, ready-to-use single-family wooden house:
– non-load-bearing partition walls;
– systems (electrical, plumbing, etc.);
– screeds;
– flooring;
– wall and floor coverings;
– interior doors;
– bathroom fixtures and finishes.
With the turnkey formula, anyone choosing a wooden villa doesn’t need to coordinate different suppliers or manage uncertain timelines: Subissati oversees the entire process, from design to handing over the keys.
Why a Subissati wooden villa is so quick to build
The secret behind this construction speed is the result of a well-defined working method: keeping all production in-house. The walls and structural elements of the single-family wooden house in Osimo were prepared and assembled at Subissati’s facilities even before the construction site was opened. When the technicians arrive on site, the work consists of installing the already finished elements: a process that drastically reduces construction time, without any compromise on quality, and a decisive advantage for anyone choosing a single-family wooden house over a traditional construction.
Flexibility and control, from design to delivery
From design to delivery, the entire project is managed in-house to ensure maximum time optimization, error reduction and an excellent quality standard. The design, also shown in 3D, allows the client to approve the result with full awareness of every detail, while internally we start the production process, guaranteeing strict compliance with the established timeframes and costs.
Our departments, spread across a production area of over 22,000 sqm of facilities, are in constant dialogue with the technical team, which oversees and approves each stage of execution and the resulting outcomes: inspection and storage of raw materials, wood processing, painting, wall assembly and preparation, as well as a mechanical workshop for the production of metal carpentry and structures for mixed steel/timber construction projects.
Using the same methodology, we oversee and coordinate on-site activities right through to inspection and delivery of the building within the agreed timeframe: the result is an efficient, punctual process with a flawless outcome — the same standard that characterizes every turnkey wooden villa signed by Subissati.
Features of the single-family wooden house in Osimo
This single-family wooden house, developed entirely on a single floor, has a living area of 180 sqm and a 35 sqm covered porch, designed as a natural extension of the living area towards the outdoors. The Platform Frame system ensures high execution precision, fast assembly and excellent structural performance, particularly in seismic terms, while the wall stratigraphy guarantees high thermal and acoustic performance and excellent year-round living comfort — features that make this wooden house in Osimo a concrete example of Subissati’s construction quality in the Marche region.
For more details on the project, you can read the introductory news article: (link to previous news article)
Interior work has just begun: stay tuned to discover the next updates on the single-family wooden house in Osimo, right through to final delivery.
In the meantime, if you’d like some inspiration, take a look at our completed wooden houses, divided into classic, contemporary, multi-story and multi-family styles.






