news

25.11.2015

Built in 60 days primary school Gradara (PU)

1
2
3

Completed in 60 days the expansion of primary school street in the town of Tavullia Gradara.

The completed work for several days, affecting a wooden construction on one floor of about 230 square meters in expansion to the existing school complex.

As always, the building was built with highly insulated enclosures and appropriate technological systems to allow the construction to have an energy certification in Class A.

Particle attention was also paid to comfort and indoor climate of classrooms, for this purpose a heat recovery system was expected (controlled mechanical ventilation). The installation of air renewal systems with heat recovery for the control of the correct level of comfort environment, the air renewal ensures the healthiness of spaces occupied by the pupils.

The building was built for the laminated timber structure with Platform Frame construction system for a nominal life of 100 years and a User Class of construction with a value of IV, which according to the standard reference technique DM 14.01.2008 is assimilated in order of importance to the "buildings with public functions or important strategic, even with reference to the management of civil protection in the event of disasters".

 

 

The official opening is scheduled for the morning of Saturday 19 December .

 

  

Client: City of Gradara - Legal Representative Mayor Franca Foronchi

RUP : ing . Paolo Morelli - ing. Ilaria Ancona

Executive design : Technical office Subissati and Consultec soc . coop

 

 

BACK TO HOME

LA TUA CASA SUBISSATI RICHIEDI UN PREVENTIVO